Build Plan

The roadmap agreed at project kickoff. Each step is committed separately so the app can be deployed and used at any point in the sequence.

# Step Status
1 Repo scaffold, Dockerfile, Prisma schema, auth (admin email/password, operator PIN, 12h session) done
2 Admin CRUD: Machines, Operation Templates, Projects → Assemblies → Parts, file uploads done
3 Operation authoring (template or ad-hoc) + QR token generation done
4 Operator scan flow: claim → start → units/notes → QC prompt → close done
5 PDF generation: per-operation card + per-part cover sheet done
6 Fasteners + PO (PDF + lifecycle: draft → sent → partial → received) done
7 Admin dashboard (WIP, overdue, plan-vs-actual hours by machine/operator) + audit log viewer done
8 In-browser STEP viewer + server-side thumbnails done
9 QC records (inline checkboxes + dedicated QC op type + fail-handling workflow) done
10 OpenAPI docs at /api/docs, nightly SQLite backup script planned

Post-kickoff additions

Items that came out of floor-testing, not in the original roadmap.

Landed

Step What Status
A1 File attachments on Assembly (STEP / drawing / cut) — shared across all parts in the assembly done
A2 Quick-link files on operator scan card (drawing + cut tap-targets; STEP rendered inline instead of downloaded) done
A3 Total quantity to produce (assembly.qty × part.qty) shown on scan card, traveler cover, op cards done
A4 Part + assembly drawing PDFs inlined into the traveler output (cover → assembly drawing → part drawing → op cards) done
A5 Partial-completion state (partial status + cumulative unitsCompleted counter); claim accepts pending OR partial; release → partial when units>0 done
A6 3D STEP viewer embedded on operator scan card + admin assembly page (shared StepViewerPanel, load-on-tap) done
A7 "Done" button auto-detects partial: if typed units < remaining, step ends partial and releases claim instead of locking completed done
A8 QC fail workflow: kind="qc" dedicated inspection steps + qc_failed status blocks reclaim until admin hits qc-reset (landed together with Step 9) done

Planned

Step What Notes
B1 Operator /op dashboard lists resumable ops (status = "partial" with no current claim) Needed because A5+A7 mean partial ops become unclaimed — they currently only re-surface when someone physically re-scans the card
B2 Progress column on traveler cover + op cards (X of Y done) driven by unitsCompleted Makes paper reflect reality when a traveler is re-printed mid-run
B3 QC fail workflow on close Landed as A8 alongside Step 9 — qc_failed locks the step; admin qc-reset rolls it back to pending/partial based on unitsCompleted

Hours-by-machine / plan-vs-actual reporting is already scoped in Step 7. Fresh-testing findings are tracked ad-hoc.

Locked design decisions

  • Hierarchy: Project → Assembly → Part → Operation.
  • QR granularity: one QR per Operation; each step prints its own card.
  • Claim model: an Operation locks to one operator on Start; other scans of an in-progress operation show a read-only view noting who holds it. partial ops are unclaimed and resumable by any operator.
  • Operators can hold multiple operations at once (across different parts).
  • Purchase orders: PDF generation + lifecycle states (draft → sent → partial → received → cancelled).
  • No offline mode. The app assumes the shop LAN is up.
  • Language: English only in the UI.
  • Persistence: SQLite in a single mounted /data volume; migrations via Prisma.
  • Integrations: none for now; REST API is versioned (/api/v1/*) and fully documented for future use.