Build Plan
The roadmap agreed at project kickoff. Each step is committed separately so the app can be deployed and used at any point in the sequence.
| # | Step | Status |
|---|---|---|
| 1 | Repo scaffold, Dockerfile, Prisma schema, auth (admin email/password, operator PIN, 12h session) | done |
| 2 | Admin CRUD: Machines, Operation Templates, Projects → Assemblies → Parts, file uploads | done |
| 3 | Operation authoring (template or ad-hoc) + QR token generation | done |
| 4 | Operator scan flow: claim → start → units/notes → QC prompt → close | done |
| 5 | PDF generation: per-operation card + per-part cover sheet | done |
| 6 | Fasteners + PO (PDF + lifecycle: draft → sent → partial → received) | done |
| 7 | Admin dashboard (WIP, overdue, plan-vs-actual hours by machine/operator) + audit log viewer | done |
| 8 | In-browser STEP viewer + server-side thumbnails | done |
| 9 | QC records (inline checkboxes + dedicated QC op type + fail-handling workflow) | done |
| 10 | OpenAPI docs at /api/docs, nightly SQLite backup script |
planned |
Post-kickoff additions
Items that came out of floor-testing, not in the original roadmap.
Landed
| Step | What | Status |
|---|---|---|
| A1 | File attachments on Assembly (STEP / drawing / cut) — shared across all parts in the assembly | done |
| A2 | Quick-link files on operator scan card (drawing + cut tap-targets; STEP rendered inline instead of downloaded) | done |
| A3 | Total quantity to produce (assembly.qty × part.qty) shown on scan card, traveler cover, op cards |
done |
| A4 | Part + assembly drawing PDFs inlined into the traveler output (cover → assembly drawing → part drawing → op cards) | done |
| A5 | Partial-completion state (partial status + cumulative unitsCompleted counter); claim accepts pending OR partial; release → partial when units>0 |
done |
| A6 | 3D STEP viewer embedded on operator scan card + admin assembly page (shared StepViewerPanel, load-on-tap) |
done |
| A7 | "Done" button auto-detects partial: if typed units < remaining, step ends partial and releases claim instead of locking completed |
done |
| A8 | QC fail workflow: kind="qc" dedicated inspection steps + qc_failed status blocks reclaim until admin hits qc-reset (landed together with Step 9) |
done |
Planned
| Step | What | Notes |
|---|---|---|
| B1 | Operator /op dashboard lists resumable ops (status = "partial" with no current claim) |
Needed because A5+A7 mean partial ops become unclaimed — they currently only re-surface when someone physically re-scans the card |
| B2 | Progress column on traveler cover + op cards (X of Y done) driven by unitsCompleted |
Makes paper reflect reality when a traveler is re-printed mid-run |
Landed as A8 alongside Step 9 — qc_failed locks the step; admin qc-reset rolls it back to pending/partial based on unitsCompleted |
Hours-by-machine / plan-vs-actual reporting is already scoped in Step 7. Fresh-testing findings are tracked ad-hoc.
Locked design decisions
- Hierarchy: Project → Assembly → Part → Operation.
- QR granularity: one QR per Operation; each step prints its own card.
- Claim model: an Operation locks to one operator on Start; other scans of an in-progress operation show a read-only view noting who holds it.
partialops are unclaimed and resumable by any operator. - Operators can hold multiple operations at once (across different parts).
- Purchase orders: PDF generation + lifecycle states (
draft → sent → partial → received → cancelled). - No offline mode. The app assumes the shop LAN is up.
- Language: English only in the UI.
- Persistence: SQLite in a single mounted
/datavolume; migrations via Prisma. - Integrations: none for now; REST API is versioned (
/api/v1/*) and fully documented for future use.